EnglishVietNam

Login Form






Lost Password?

Nhận tin






Home page arrow Projects arrow 189 Nguyen Thi Minh Khai Project

193 Dinh Tien Hoang Street

Project :Office building

Investor :Hochiminh City Metal Corporation

Fund :By Investor’s capital, commercial bank loan, stocks issuance

Total  invested capital :80 billion VND

Address of the site :No 193 Dinh Tien Hoang Street, Dakao Ward, Dist. 1, Hochiminh City  

Construction surface :1,323 Sq.m (according to map center of Land Property and environment Department on January 9th,2007.The site surface based on calculating after widening the road from 30 to 40 meter (by Decision No101 of Prime Minister on 22/01/2007) is 1,201.9 Sq.m

Designer :Duong Dai Consultant, Design and Construction Ltd.
Geographical investigator :Research and application Center of  Hochiminh City
Polytechnics University

Consulting and General Construction Joint Stock company (Nagecco)

Description of the building :

  • Designing capability :
  •  Car park :for 54 cars, 217 motobikes
  • Office building :served for 1,000 members
  • 12 floors :Ground and half-ground floor and 11 floors, 02 underground floors and the up roof floor for technical services. Height 58.2m
  • The building consists of three lifts and two stair cases for emergency exit
  • Total construction surface :10,896.2 Sqm
  • Underground floor No1 :(1,082 Sqm) Saved for car parking, stair case, lift, technical service, safeguard, camera room, store house, generator, transformer
  • Underground floor No2 :(1,082 Sqm) Saved for car parking, fire exguishing, pools, technical room, pumping room, ware house, water pool, fire exguishing equipments room
  • Ground floor :(629 Sqm) guest arrival room, staircase, lift, lobby, technical room, generator, toilets.
  • Half-ground floor :(463.5 Sqm) Canteen, staircase, lift, lobby, technical room, toilets.
  • 2nd, 3rd floor :(647.8 Sqm/floor x 2 = 1,295.6 Sqm) Conference room of 250 seats, meeting room, staircase, lift, lobby, technical room, refreshing, toilets.
  • 4th floor to 10th floor :(658.8 Sqm/floor x 7 = 4,611.6 Sqm) Room for rent, staircase, lift, lobby, technical room, toilets
  • Top floor :(156.5 Sqm) technical service floor
  • Total land surface :629 Sqm
  • Total construction surface for use :6,464.1 Sqm
  • Total sub-surface and technical service :4,011.1 Sqm
 